Research on the Testing Duration of Planning Model

Reliability growth plans are typically described by using reliability growth planning models that generate growth planning curves. The PM2 model, known as the planning model based on projection methodology, is a widely used growth planning model. The PM2 model can always meet the assigned reliability target during any reliability growth testing duration, regardless of changes in the management strategy parameter and/or the fixed effectiveness factor parameter. In fact, these two parameters determine whether reliability growth testing is successful or not and how long it takes. That is, the PM2 model currently in place needs to be modified accordingly. Firstly, a sensitivity analysis is carried out on the three parameters of the PM2 model, followed by a discussion on the correlation between the product of two process management parameters and the duration of testing. Then, a relationship equation for the testing duration is constructed using these two process management parameters. Finally, an extended model for planning reliability growth has been proposed. In addition, the proposed planning model is utilized to examine an illustrated example and a real case. The results have demonstrated that the model is reasonable and reliable, as the testing duration, was removed from the reliability growth planning model.

reliability growth PM2 model nonlinear equation engineering management testing duration sensitivity analysis

References

  1. Crow LH. Reliability growth Planning Curves Based on Multi-Phase Projections. In Proceedings of the 2015 Annual Reliability & Maintainability Symposium, Palm Harbor, FL, USA, 26–29 January 2015.
  2. Crow LH. The Extended Continuous Evaluation Reliability Growth Model. In Proceedings of the 2010 Annual Reliability & Maintainability Symposium, San Jose, CA, USA, 25–28 January 2010.
  3. Weiss HK. Estimation of Reliability Growth in a Complex System with a Poisson-Type Failure. Operations Research 1956; 4(5): 532–545.
  4. Duane JT. Learning Curve Approach to Reliability Monitoring. IEEE Transactions on Aerospace and Electronic Systems 1964; 2(2): 563–566.
  5. Selby J, Miller S. Reliability Planning and Management (RPM). In Proceedings of the American Society of Quality Control/Site Reliability Engineer Seminar, Niagara Falls, NY, USA, 1970.
  6. Department of Defense, Reliability Growth Management. Military Handbook 189A; Naval Publications and Forms Center: Philadelphia, PA, USA, 1981.
  7. Ellner PM, Wald LC. AMSAA Maturity Projection Model. In Proceedings of the 1995 Annual Reliability & Maintainability Symposium, Washington, DC, USA, 16–19 January 1995.
  8. Ellner PM, Hall JB. AMSAA Maturity Projection Model Based on Stein Estimation. In Proceedings of the 2005 Annual Reliability & Maintainability Symposium, Alexandria, VA, USA, 24–27 January 2005.
  9. Crow LH. An Extended Reliability Growth Model for Managing and Assessing Corrective Actions. In Proceedings of the 2004 Annual Reliability & Maintainability Symposium, Los Angeles, CA, USA, 26–29 January 2004.
  10. Strunz R, Herrmann JW. Planning, Tracking, and Projecting Reliability Growth a Bayesian Approach. In Proceedings of the 2012 Annual Reliability & Maintainability Symposium, Reno, NV, USA, 23–26 January 2012.
  11. Bell JL, Bearden SD. Reliability Growth Planning Based on Essential Function Failures. In Proceedings of the 2014 Annual Reliability & Maintainability Symposium, Colorado Springs, CO, USA, 27–30 January 2014.
  12. Wayne M, Modarres M. A Bayesian Model for Complex System Reliability Growth Under Arbitrary Corrective Actions. IEEE Transactions on Reliability 2015; 64(1): 206–220.
  13. Jackson C. Reliability Growth and Demonstration: The Multi-Phase Reliability Growth Model (MPRGM). In Proceedings of the 2016 Annual Reliability & Maintainability Symposium, Tucson, AZ, USA, 25–28 January 2016.
  14. Li Z, Mobin M, Keyser T. Multi-Objective and Multi-Stage Reliability Growth Planning in Early Product-Development Stage. IEEE Transactions on Reliability 2016; 65(2): 769–781.
  15. Jin T, Li ZS. Reliability Growth Planning for Product-Service Integration. In Proceedings of the 2016 Annual Reliability & Maintainability Symposium, Tucson, AZ, USA, 25–28 January 2016.
  16. Heydari M, Sullivan KM. An Integrated Approach to Redundancy Allocation and Test Planning for Reliability Growth. Computers & Operations Research 2017; 92: 182–193.
  17. Crow LH. The Extended Discrete Reliability Growth Planning Model. In Proceedings of the 2017 Annual Reliability & Maintainability Symposium, Orlando, FL, USA, 23–26 January 2017.
  18. Crow LH. Estimating the Management Strategy for Reliability Growth Planning. In Proceedings of the 2014 Annual Reliability & Maintainability Symposium, Colorado Springs, CO, USA, 27–30 January 2014.
  19. Ellner PM, Trapnell B. AMSAA Reliability Growth Data Study; Interim Note R-184; The Army Materiel Systems Analysis Activity: Aberdeen Proving Ground, MD, USA, 1990.
  20. Coit DW. Economic Allocation of Test Times for Subsystem-Level Reliability Growth Testing. IIE Transactions 1998; 30(12): 1143–1151.
  21. Jin T, Wang H. A Multi-Objective Decision Making on Reliability Growth Planning for in-Service Systems. In Proceedings of the 2009 Annual Reliability & Maintainability Symposium, San Antonio, TX, USA, 11–14 October 2009.
  22. Calomeris M, Herbert N. A Comparison of PM2 and Crow Extended Growth Planning Models. In Proceedings of the 2013 Annual Reliability & Maintainability Symposium, Orlando, FL, USA, 28–31 January 2013.
  23. Awad M. Reliability Growth Test Planning of Repairable Systems Using Subsystem Failure Distribution Data. In Proceedings of the 2015 International Conference on Industrial Engineering & Systems Management, Seville, Spain, 21–23 October 2015.
  24. Honecker SL, Yenal U. Quantifying the Effect of a Potential Corrective Action on Product Life. In Proceedings of the 2017 Annual Reliability & Maintainability Symposium, Orlando, FL, USA, 23–26 January 2017.
  25. Yangwoo S, Eunshim P, Youngkuk K. Reliability Growth Planning for a Military System Using PM2-Continuous Model. Journal of Applied Reliability 2018; 18(3): 201–207.
  26. Li YJ, Long JL, Park YZ. A Case Study on Reliability Prediction of Launch Pad Systems Using Well Testing Effectiveness Coefficient Simulation. Journal of the Korean Institute of Industry and Technology 2021; 22(9).
  27. Li ZS, Fan JW, Wu CJ, et al. Study on the Parameters Relationship of PM2 Planning Model. Journal of the Chinese Institute of Engineers 2019; 42(8): 1–8.
  28. Brown SM. Development and Validation of Methodology for Fix Effectiveness Projection During Product Development. Ph.D. Thesis, University of Maryland, College Park, MD, USA, 2009.
  29. Li ZS, Qin HX. Optimization Design of Reliability-Growth Plan Based on Sensitivity Analysis. Mechanical Engineering & Automation 2021; (03): 46–49.
  30. Crow LH. Planning a Reliability Growth Program Utilizing Historical Data. In Proceedings of the 2011 Annual Reliability & Maintainability Symposium, Lake Buena Vista, FL, USA, 24–27 January 2011.
  31. ReliaSoft Corporation. Training Guide, RGA; ReliaSoft Corporation: Tucson, AZ, USA, 2009; Volume 7, pp. 99–101.

Supporting Agencies

  1. Funding: The research was sponsored by 2023 Year’s Doctoral Fund: Research on Reliability Technology for Digitalization of Manufacturing Industry [Project Numbers1402307].